Bayer Becker will be responsible for the design of the new Mustang Athletic Complex for Bishop Brossart High School. We provided topographic survey and basemap, concept planning, 3D modeling and video graphics, mass grading and erosion control plans, storm water detention and water quality design, assistance with environmental permitting, and mass grade bidding including preparation of bid documents and specs. The project has hopes of being finished in 2019 to start hosting games and events and allowing the school to finally enjoy playing on a home turf after years of having to travel to different schools and fields to play their games.

“Brossart recently announced a fundraising campaign for a new athletic complex. The Mustang Athletic Complex, on 27 acres of Gilbert Ridge Road less than a mile from the school, will have a stadium for football and soccer with an eight-lane track, lights and lockers. The second phase of the project will eventually include baseball and softball fields”. Check out more about this great project in the link below:

Read the full story on Cincinnati.com HERE.

Get In Touch With Us

  • CINCINNATI   (513) 834-6151
    1404 Race Street Suite 204
    Cincinnati, Ohio  45202
  • INDIANAPOLIS   (317) 207-1979
    1060 North Capitol Ave Office 15
    Indianapolis, IN  46204
  • MASON   (513) 336-6600
    6900 Tylersville Road Suite A
    Mason, Ohio  45040
  • NORTHERN KENTUCKY   (859) 261-1113
    209 Grandview Drive
    Fort Mitchell, Kentucky  41017
  • OXFORD   (513) 523-4270
    110 South College Avenue Suite 101
    Oxford, Ohio  45056