WAR-22 at Stillwater Dr & Old 3C Hwy (Rivercrest)

Aerial view of a winding road through autumn trees with colorful foliage.
Aerial view of a road roundabout with a white gazebo and autumn trees.
Aerial view of a quiet road intersection surrounded by autumn trees.

As part of the Rivercrest residential development, Bayer Becker prepared a traffic impact study. Our team performed data collection, traffic engineering calculations, and analysis. The study determined the need for road improvements along US 22 / SR 3 including a left turn lane at Stillwater Drive (access to the proposed development) and a right turn lane at Old 3C Highway. 

Relative to the roadway improvements, Bayer Becker performed topographic survey field work, research, roadway design, traffic control planning, etc for the preparation of construction drawings. The construction drawings consisted of typical sections, general notes, general summary, a roadway plan, cross-sections, drive profiles, intersection details, storm and culvert profiles, and a traffic control plan. Other engineering tasks included grading and drainage design, as well as the incorporation of stormwater best management practices (BMPs).

Client
ODOT & Warren County Engineer's Office
Location
Maineville , OH , Warren County

More Featured Projects

Aerial view of a modern park surrounded by trees.
The Pat Beck & June Rininger Memorial Park, located within a designated...
Roundabout with green center, surrounded by roads and grassy fields.
The project involved extending Ivy Pointe Boulevard approximately 2,500 feet from a...
Aerial view of a green suburban area with roads and buildings.
Bayer Becker is providing professional engineering services for the Fields Ertel Rd...