Peter Cremer phase II

Aerial view of a white industrial building by a railway and river, surrounded by greenery.
Large warehouse with trucks parked, grassy area to the side.
View of a curved road with a large white building beside it, near a river and hills.

Revitalizing a site that was used for dumping of excess fill material was one of the challenges Bayer Becker faced with Peter Cremer North America’s facility in Cincinnati. To help control costs, Bayer Becker’s design utilized the fill material that had accumulated on the site over time. The grading of the site was vital to ensure future tie-ins to an adjacent existing rail line would function as required by the rail line operators. Grading, utilities and driveway locations had to be coordinated with a City of Cincinnati roadway project, which was being designed and constructed simultaneously to the Peter Cremer project. Bayer Becker’s landscape architecture design included a rain garden in the center of the employee parking lot. The rain garden provides both landscaping for the parking lot and post construction water quality treatment.

Client
Merus
Location
Cincinnati , OH , Hamilton County
Size
10 acres
Market

More Featured Projects

Aerial view of a modern park surrounded by trees.
The Pat Beck & June Rininger Memorial Park, located within a designated...
Roundabout with green center, surrounded by roads and grassy fields.
The project involved extending Ivy Pointe Boulevard approximately 2,500 feet from a...
Aerial view of a green suburban area with roads and buildings.
Bayer Becker is providing professional engineering services for the Fields Ertel Rd...