Naegle Road Lift Station Elimination
Bayer Becker is currently under contract with the Clermont County Water Resources Department to prepare the design and contract documents to eliminate the Naegele Road lift station. The project includes extension of 111’ of 8” gravity sewer main, transfer of flow from the lift station to the new gravity sewer, demolition of the existing lift station, and abandonment of the existing force main. Bayer Becker engineers developed a specification section to address the unique aspects of the lift station demolition including instructions for removal of the electric service, salvage of equipment, disposal of sewage, and treatment of the existing concrete wet well and valve vault.
Client
Clermont County Water Resources
Location
Pierce Twp
,
OH
,
Clermont County
Size
111 LF
Market
Services
More Featured Projects
Parks & Recreation
OH
The Pat Beck & June Rininger Memorial Park, located within a designated...
Roadway Infrastructure
Traffic Infrastructure
OH
The project involved extending Ivy Pointe Boulevard approximately 2,500 feet from a...
Roadway Infrastructure
Traffic Infrastructure
OH
Bayer Becker is providing professional engineering services for the Fields Ertel Rd...