McPicken Rd & Menno Dr Watermain Replacement

Engineering blueprint with labeled sections and measurements.

Bayer Becker provided land surveying and civil engineering design services for the McPicken Road and Menno Drive Water Main Replacement project. The project consisted of the replacement of existing 6” cast iron water mains along McPicken Road (2,200 LF) and Menno Drive (850 LF) with 8” ductile iron mains. The design included the reconnection of existing water services to the new main and installation of new fire hydrants throughout the length of the project. In addition, Bayer Becker proposed a replacement main alignment that minimized impacts to the existing roadway pavement and to other roadside infrastructure.

Client
Clermont County Water Resources
Location
Miami Twp , OH , Clermont County
Size
3,050 LF

More Featured Projects

Modern office building with flags and empty parking lot at sunset.
DAV is developing a new Class A headquarters with approximately 66,000 SF...
Brown dog standing on grass at a busy dog park.
The City of Erlanger’s Eons Adventure Park is a transformative effort to...
Aerial view of a park with winding paths and trees.
The Kenton County Legacy Park project represents a transformative investment in the...