Ivy Pointe Roadway Extension

Roundabout with green center, surrounded by roads and grassy fields.
Aerial view of a rural intersection with roads, trees, and a field.
Aerial view of a four-way intersection with minimal traffic.

The project involved extending Ivy Pointe Boulevard approximately 2,500 feet from a roundabout at Ferguson Drive to Aicholtz Road. The roadway extension consists of a three-lane section with landscaped medians or turn lanes where appropriate, curb and gutter, and storm sewer drainage. Bayer Becker prepared turn lane storage length calculations for the extension and designed the vertical and horizontal alignment of the roadway. The design also included a sanitary sewer, a water main, an irrigation system, street lighting and a combined utility trench that houses gas, electric, telephone and cable. 

In addition to the extension, the project also included realignment of nearby Omni Drive and the design of a sanitary sewer extension along Aicholtz Road. The expansion of an existing regional retention basin helped alleviate current drainage issues as well as eliminate any issue because of future development in the area. Design for the project had to account for and maintain access to two existing billboards and a cell tower. Coordination of the project involved Clermont County, the township, adjacent property owners, and another consultant providing services on the adjacent Aicholtz Road connector project.

Client
Clermont County TID
Location
Union Twp , OH , Clermont County
Size
2,500 FT

More Featured Projects

Aerial view of a modern park surrounded by trees.
The Pat Beck & June Rininger Memorial Park, located within a designated...
Aerial view of a green suburban area with roads and buildings.
Bayer Becker is providing professional engineering services for the Fields Ertel Rd...
Aerial view of urban buildings and streets with autumn trees.
Renovations to the main branch facility are part of the $350 million...