Hamilton Enterprise Park Sanitary & Storm Relocation

Warehouse with parked trucks and cars, surrounded by green lawns.
Warehouse beside a road, surrounded by green fields under a cloudy sky.
Industrial park with warehouses, parked trucks, and cars under a cloudy sky.

Bayer Becker partnered with the City of Hamilton to deliver comprehensive civil engineering and land surveying services in support of a major industrial development initiative. The project involved the strategic relocation of an existing sanitary sewer main, stormwater channel, and detention basin to accommodate future site construction.

Our engineering team collaborated closely with environmental consultants to design a new stormwater channel that met U.S. Army Corps of Engineers (ACOE) permit requirements. The sanitary sewer work included the relocation of 1,100 linear feet of 15-inch main.

To manage stormwater effectively, a new detention basin was designed with a storage capacity of 10.8 acre-feet, serving a 280-acre watershed. To streamline approvals and maintain the project schedule, the basin was intentionally designed to remain below the threshold requiring an Ohio Department of Natural Resources (ODNR) Dam Permit.

Client
City of Hamilton, OH
Location
Hamilton , OH , Butler County
Size
1,100 LF

More Featured Projects

Aerial view of a modern park surrounded by trees.
The Pat Beck & June Rininger Memorial Park, located within a designated...
Roundabout with green center, surrounded by roads and grassy fields.
The project involved extending Ivy Pointe Boulevard approximately 2,500 feet from a...
Aerial view of a green suburban area with roads and buildings.
Bayer Becker is providing professional engineering services for the Fields Ertel Rd...